Residential · Bathroom

Bathroom Gut Renovation

A dated bathroom taken down to the studs and rebuilt with new tile, waterproofing, vanity, fixtures and lighting.

Location
Long Island, NY
Project Type
Residential · Bathroom
Timeline
2025
Gazelle Role
General contractor

Overview

Part of a larger project at this home. The existing bathroom was gutted to the framing, the plumbing reworked for the new layout, walls boarded and waterproofed, then tiled floor to ceiling with a new vanity, mirror, fixtures and lighting.

The Challenge

Old framing and plumbing behind the walls had to be dealt with before anything new went in, and the bathroom had to be back in service on schedule.

The Work

Demolition to studs; rough plumbing and electrical coordinated with licensed trades; cement board and waterproofing; floor and wall tile; vanity, mirror, toilet, fixtures and lighting; trim and paint.

Where It Stands

A finished bathroom, photographed on completion.

Have a similar project?

Send the property, what it needs and where it stands. We’ll review the scope and come back with next steps.

Call Gazelle Request a Quote